  • Client: FERMACA PIPELINE DE OCCIDENTE
  • Country: Mexico
  • Start date: 2016
  • Ending date: 2018
  • Hours contract: 710.000
  • Engineering hours: 68.000
Download datasheet

Compression station Villa de Reyes, San Luis Potosi, Mexico.

SENER is responsable of the engineering, procurement, construction and start-up of Natural Gas Compression Plant

3 SIEMENS STG 400 Turbo Compressor Units were installed to handle up to 900 million cubic feet per day and a maximum pressure of 1100 psi, refrigerated by dedicated Aero refrigerators for each Turbo Compressor.

The extent of the Project includes:

  • Buildings
  • Roadways,
  • Distributed Control System (DCS) – Gas and Fire and Emergency Shutdown
  • All of BOP
  • 1750 kw diesel electricity generation system
  • Whole electrical installation at medium and low tension

Project included in the Natural Gas Transport System owned by the FERMACA group, the main Mexican operator, operating this trunk system for the import and distribution of natural gas from the United States across the centre of Mexico: El Paso (USA) – Chihuahua – El Encino – La Laguna – Aguas Calientes – Guadalajara – Villa de Reyes

Other programs